ABC Project, Côte d’Ivoire
Overview
ABC Project, Côte d’Ivoire
The ABC Project, located in northwest Côte d’Ivoire, is a greenfield project with an Inferred Mineral Resource Estimate of 2.16Moz. The Project is approximately 550km northwest of Abidjan and 460km west of the Doropo project.
The ABC Project currently consists of four exploration permits – Faraka-Nafana, Kona, Windou and Gbemanzo – all of which are 100% owned by Resolute.
The ABC Kona project is situated along the main Archean-Birimian Cratonic suture zone in western Côte d’Ivoire, specifically associated with the Sassandra Fault Zone. The existing inferred Mineral Resources Estimate is located on the Kona exploration permit.
In July 2026, the Inferred Mineral Resource Estimate was expanded to 3.0 Moz of Contained Gold.
Inferred Mineral Resources
(at 0.3 g/t cut off, $3,250/oz optimised pit shell)

Next Steps
Resolute has approved the next phase of work to advance ABC through feasibility studies. The work programme includes further infill and extension drilling, technical studies, environmental and social baseline work and metallurgical testwork.
Resolute is ramping up drilling activity across the ABC Project, with at least 80,000m of drilling planned over the second half of 2026. The aim of the drill programme is to expand the resource further and convert Inferred Mineral Resources into the Indicated category







